英国标准 BS 4875-7-家具的强度和稳定性-储存家具耐力和强度的测定
Test item 测试名称: | |
Furniture - Strength and stability of furniture - Part 7: Domestic and contract storage furniture-Performance requirements | |
家具-家具的强度和稳定性-储存家具耐力和强度的测定 | |
Test info 测试内容: | |
Clause | Test Requirement |
6.2.2 | Static load test for tops and bottoms顶面和底面的静态载荷测试 |
6.2.1 | Sustained load test for tops and bottoms顶面和底面的长期载荷测试 |
6.1.4 | Strength of shelf supports 架子的支撑的强度 |
6.1.3 | Deflection of shelves 架子的变形量 |
6.3.1 | Strength of clothes rail suports挂衣杆的支撑的强度 |
6.3.2 | Dislodgment of clothes rails 挂衣杆均匀负重测试 |
7.1.2.1 | Vertical load on pivoted doors轴心门的垂直载荷 |
7.1.2.2 | Horizontal load on pivoted doors轴心门的水平载荷 |
7.2.3 | Durability of sliding doors and horizontal roll fronts滑动门和水平卷帘门的耐久性测试 |
7.1.3 | Slam shut test of pivoted doors轴心门的撞击测试 |
7.1.4 | Durability of pivoted doors轴心门的耐久性测试 |
7.2.2 | Slam shut/open of sliding doors and horizontal roll fronts滑动门和水平卷帘门的撞击测试 |
7.3.1 | Strength of bottom-hinged flaps底面装铰链的吊板的强度 |
7.3.2 | Durability of flaps吊板的耐久性测试 |
7.3.3 | Drop test for top-hinged flaps顶面装铰链的吊板的跌落测试 |
7.4.2 | Durability of vertical roll fronts垂直卷帘门的耐久性测试 |
7.4.1 | Slam shut/open of vertical roll fronts垂直卷帘门的撞击测试 |
7.5.2 | Strength of extension elements 伸出部件强度 |
7.5.3 | Durability of extension elements 伸出部件的耐久性 |
7.5.4 | Slam open/shut test of extension elements 伸出部件的急开急闭测试 |
7.5.5 | Displacement of extension element bottoms 伸出部件底部测试 |
7.5.6 | Interlock test 互锁 |
7.6.2 | Strength test for locking and latching mechanisms for extension elements |
伸出部件锁强度测试 | |
7.6.3 | Strength test for locking and latching mechanisms for doors, flaps and roll fronts 门、翼板锁强度测试 |
6.4.1 | Test for structure and underframe结构和框架的测试 |
6.4.3 | Test for units with castors or wheels 带轮子的柜子测试 |
8.1.3 | Sustained load test 长期承重测试 |
8.1.4 | Dislodgement test 抗分离测试 |
Sample required: 3 sets of completed products with assembly instruction (if applicable). | |
样品要求: 全套样品3 套并包括安装说明书(如适用). | |
Turnaround time: Regular (12-17 working days), Express (9-12 working days). | |
所需时间: 标准(12-17 个工作天), 加快(9-12 个工作天). |
Sample for reference 参考图片:
">Sample Report 报告样本:
展开全文
相关产品